Construction Access
Systems: PROJECT

One Park Drive Tower, Canary Wharf, London

Common Tower System Installation

THE CHALLENGE
Early engagement with the client Canary Wharf Contractors Ltd, provided ideas that were eventually modified to allow the client to provide a tender package. CAS continued to help with the construction teams post tender and through to detailed design and order.

SOLUTION
Construction Access Systems provided our Common Tower System and integrated staircase system for the 205 meter, 59 story Tower. Alimak Group provided a large Mammoth hoist for the cladding contractor, and a selection of high and medium speed hoists.

RESULTS
An extremely effective Common Tower solution was developed overtime to overcome what was a challenging building design.

 
One Park Drive3