CAS introduced a number of innovative measures to mitigate potential risks and maximise productivity on site during installation and use.
Wherever possible, steps have been taken to minimise working at height, with most of the CAS Tower often pre-constructed at ground level, and tools tethered.
Pre-assembled floor sections can be delivered and completed on the ground before being lifted into position. This reduces the risk of anything being dropped from height and enables faster installation. Where ground space isn’t available however, safe manual assembly is also possible.