One Park Drive Tower, Canary Wharf, London

Early engagement with the client allowed us to assist with producing a competitive tender package for a challenging building design. CAS continued to assist the construction teams post tender, through to detailed design and order.


We supplied our CAS Tower and integrated staircase system for the 205 meter, 59 storey project. A large Mammoth hoist was provided to work in tandem with the system for the cladding contractor, along with a selection of high and medium speed hoists.


construction hoists london

Projet Galerie

Projet Services

demandes de renseignements

Entrer en contact pour des devis et plus d'informations

Formulaire de demande

You can get in touch using our contact form below.

Pour en savoir plus sur la façon dont nous traitons vos données, veuillez lire notre politique de confidentialité.

Send